[STS124-Discovery] EVA2
Page 1 sur 2
Page 1 sur 2 • 1, 2
Fil dédié à l'EVA2
Paris: GMT +2
Québec: GMT -4
Désolé pour le franglais
1) Préparation EVA 2 (11:12 GMT)
2) Japanese module outfitting and rack transfer from logistics module to pressurized module (12:47 GMT)
3) EVA 2, Fossum et Garan (15:32 GMT), durée : 6 heures 30 minutes
EVA operations:
- Installation of forward and aft Japanese television equipment on Kibo (16:07 GMT)
- Prepare the Japanese module’s robotic arm for deployment/Removal of JEM RMS cover and end effector MLI cover (16:57 GMT)
- Prepare the active common berthing mechanism on the Kibo laboratory for the installation of a smaller part of the module delivered during STS-123
4) JPM channel A activation (17:27 GMT)
5) Harmony zenith berthing port preparation (17:57 GMT)
EVA operations:
- Installation of JEM-PM trunnion and keel covers (18:22 GMT)
- Prepare a depleted nitrogen tank assembly on the starboard truss for removal and a new one stowed on an external stowage platform on the port truss for installation (19:02 GMT)
6) JLP egress and hatch closure (19:57 GMT)
EVA operations:
- Remove a television camera with a failing power supply (20:32 GMT)
7) Réglage de la console du bras robotique du module japonais
8) Harmony zenith berthing port control panel assembly installation (21:12 GMT)
9) Fin de l'EVA2 (22:02 GMT)
Paris: GMT +2
Québec: GMT -4
Désolé pour le franglais
1) Préparation EVA 2 (11:12 GMT)
2) Japanese module outfitting and rack transfer from logistics module to pressurized module (12:47 GMT)
3) EVA 2, Fossum et Garan (15:32 GMT), durée : 6 heures 30 minutes
EVA operations:
- Installation of forward and aft Japanese television equipment on Kibo (16:07 GMT)
- Prepare the Japanese module’s robotic arm for deployment/Removal of JEM RMS cover and end effector MLI cover (16:57 GMT)
- Prepare the active common berthing mechanism on the Kibo laboratory for the installation of a smaller part of the module delivered during STS-123
4) JPM channel A activation (17:27 GMT)
5) Harmony zenith berthing port preparation (17:57 GMT)
EVA operations:
- Installation of JEM-PM trunnion and keel covers (18:22 GMT)
- Prepare a depleted nitrogen tank assembly on the starboard truss for removal and a new one stowed on an external stowage platform on the port truss for installation (19:02 GMT)
6) JLP egress and hatch closure (19:57 GMT)
EVA operations:
- Remove a television camera with a failing power supply (20:32 GMT)
7) Réglage de la console du bras robotique du module japonais
8) Harmony zenith berthing port control panel assembly installation (21:12 GMT)
9) Fin de l'EVA2 (22:02 GMT)
Mustard a écrit:Apolloman a écrit:Ca c'est une belle photo de notre planète
Ne serait ce pas une camera grand angle ? car pour une altitude d'environ 350km, je trouve la Terre bien loin et bien ronde.
Cela a été pris avec la caméra montée sur le casque de l'astronaute...
...Donc oui caméra grand angle, mais ça reste quand même super zouli !
Crubier- Messages : 120
Inscrit le : 08/04/2008
Age : 38
Localisation : Toulouse
Les couvertures du port d'amarrage du module logistique sont retirées pour que demain il puisse y être amarré.
Main engine start- Messages : 1483
Inscrit le : 10/08/2007
Age : 34
Localisation : Savigny-le-Temple (77)
Main engine start- Messages : 1483
Inscrit le : 10/08/2007
Age : 34
Localisation : Savigny-le-Temple (77)
On dévisse avec la PGT.
Main engine start- Messages : 1483
Inscrit le : 10/08/2007
Age : 34
Localisation : Savigny-le-Temple (77)
Page 1 sur 2 • 1, 2
Sujets similaires
» [STS124-Discovery] EVA 3
» [STS124 -Discovery/Kibo]: La mission
» [STS124-Discovery] Atterrissage
» [STS124 / ISS 1J] Discovery : Préparatifs
» STS124 -Discovery : lancement
» [STS124 -Discovery/Kibo]: La mission
» [STS124-Discovery] Atterrissage
» [STS124 / ISS 1J] Discovery : Préparatifs
» STS124 -Discovery : lancement
Page 1 sur 2
Permission de ce forum:
Vous ne pouvez pas répondre aux sujets dans ce forum